The chairlift lift system is a modern transportation technique particularly suitable for skiers. It enables reaching the top of the slopes in a seated position and without detaching the skis.
The chairlift system can easily be adapted to any alpine topography.
With increasingly higher rotation speeds, the latest types of chairlifts offer capacities of over 3000 passengers per hour and, in addition, the detachable chair units enable easy management of the flow of passengers.
continuous movement system
Structure
In the last few years, the structures required for a chairlift system have been greatly simplified.
Nevertheless, depending on the local topographical conditions, these structures can take various shapes.
For the construction of chairlifts, our Company provides:
- project management services
- topographical studies and definition of the layout
- structural calculation notes and construction drawings
- on site checks and financial monitoring of the project
- safety plans and operation manuals
- startup of the installation
We are giving special attention to the following:
- concrete foundations of buildings and pylons
- superstructure of the stations
- steel structure of pylons
References
SWITZERLAND:
VERBIER
Chairlift Lac I 4 pers.
Chairlift Lac III 3 pers.
Chairlift Tournelle 2 pers.
Chairlift Chablotays 2 pers.
NENDAZ
Chairlift Tortin 4 pers.
Chairlift Prarion 4 pers.
Chairlift Siviez 2 pers.
Chairlift Novelly 2 pers.
VEYSONNAZ/NENDAZ
Chairlift Greppon Blanc 2 pers.
CHAMPERY
Chairlift Chavanette 4 pers.
LES CROSETS
Chairlift Pauvre-Conche 4 pers.*
Chairlift Mossettes 4 pers.
Chairlift Planachaux 3 pers.
Chairlift Champoussin 2 pers.
TORGON
Chairlift Jorette 2 pers.*
Chairlift Plan de Croix 2 pers.*
Chairlift Tronchey 4 pers.*
ZINAL
Chairlift Chiesso 4 pers. (projet)
TESSIN
Chairlift Bergun 2 pers.*
Chairlift Nara 2 pers.
ARGENTINA:
CERRO-BAYO
- Lenga
NORTH COREA:
- Chairlift Potae Nord 1
Chairlift Pekebong
* Subcontractor of a manufacturer